On the U-Line CLRCO2075 combination clear ice machine with the first-generation Echelon board, LED 3 flashing means the drain pump is blocked or overloaded. The installation and the drain line need a check. To test, pour…
On the U-Line CLRCO2075 combination clear ice machine with the first-generation Echelon board, LED 3 flashing means the drain pump is blocked or overloaded. The installation and the drain line need a check. To test, pour a gallon of water into the bin and watch it drain. Removing power resets the board. The drain problem stops ice production, and water can build in the bin until the drain is cleared.
1. Unplug the machine. 2. Check the drain line for kinks and clogs. 3. Restore power and pour a gallon of water in the bin. 4. Watch whether the water drains. 5. If LED 3 flashes again, call us. 6. Clear any visible kink before restarting.
Pour a gallon of water into the bin and watch it. It should drain away. If it backs up, the line is blocked or the pump is overloaded.
Remove power at the plug or the breaker. The board resets, and the LED goes steady once the drain works and the water clears. Call us if it repeats.
If the water does not drain or LED 3 returns, call us. We clear the line, test the pump and give a written price first, with a 30-day warranty. We clear the line and test the pump.
A technician diagnoses it on site and gives you the price in writing before any work starts.